Wellington Indian Association

Throughout this project, our primary objective revolved around implementing measures to strengthen the sports centre against seismic activity. The entire project spanned a duration of 11 months. In order to achieve the desired level of seismic resistance, we focused on replacing the current roof with a durable steel structure. We took great care in determining the optimal pitch of the new roof to maximize stability. This modification not only enhanced the overall structural integrity of the sports centre but also provided a strong foundation for subsequent upgrades also being reinforced with micro pile anchors. Moreover, we carried out a complete demolition and subsequent office fit-out as part of the project.